Work’s begun on the latest floor of the new block at St Luke’s General Hospital for Carlow and Kilkenny.
The 72-bed facility aims to provide individual rooms with ensuites as an infection control necessity with 24 on each level.
Yesterday saw the start of the fourth floor being installed.